电气工程师的英文简历模板

英文简历3年前 (2022)更新 tang
128 0 0
马哥源码

【 zcbgdh.com – 英文简历模板 】

  电气工程师的英文简历模板

一份好的简历能够帮你更好的找到一份好工作,下面是职场办公编为大家带来的电气工程师的英文简历,希望喜欢。

Name:Mr. BNationality:China (Mainland)
Current Place:GuangzhouHeight/Weight:174 cm 65 kg
Marital Status:marriedAge:33 years
Career Objective
Application type:Jobseeker
Preferred job title:Elecrical Engineer/Technician: electrical engineer 、 Mechatronics Engineer.: 、 Automation Control Engineer/Technician:
Working life:8Title:primary title
Job type:Full timeExpected Start date:In a day
Expected salary:¥8,000~¥9,999Preferred working place:Guangzhou Foshan Shenzhen
Work experience
Company”s name:****CO., Limited    Begin and end date: 2012-06-2013-11
Enterprise nature:State-owned enterprisesIndustry: Mechanics/Electrical Equipment/Heavy Industry
Job Title:Electrical engineer
Job description:1)Travelling to factory with shipping equipment, installing and commissioning the equipment, give customer operate and maintenance training.
2)Supply spare parts after sales, ensure the customer equipment have minimum down time.
3)my main responsible on CT driver and servo motor , PLC and security current circuit, other related mechanical and pneumatic parts 。
4) Electrical circuit maintenance and sensor inspection. Including optical switch, magnet switch, touch proximity switch, infrared sensor, encoder, safety lock, sound and light horn, pressure gauge, measurement gauge, thermal couple, emergency circuit maintenance.
5)Resolve fault of Servo motor , fix all problem about inverter and other electrical equipment
6) Positioning device, put on power cable and communication wire, connecting wire, grounding and test, power on.
7)Adjust level of equipment, initial program and parameter, setting new parameter according to process. Keep our equipment continuous running when production coming. Equipment including stacker, transfer ,ITD and cross conveyor and pushbar, spray bridge.
8)Relay circuit fault check, and resolve it, including hydraulic switch ,flowmeter and plunger pump.
9)UPS power supply maintenance, ensure equipment running without shutting down.
10)work with equipment including :
1,SIEMENS step 7- 300 and 400
2,SIEMENS wccflex 2008
3,CT drive SP series and SK series
4,thermocouple
5,instrument for calculate pressure or flow
6,motor,servo motor.
7,relay,safety relay
11)my boss service manager is UK person
Reasons for leaving:
Company”s name:****CO., Limited    Begin and end date: 2009-04-2012-06
Enterprise nature:Soly foreign funded enterprisesIndustry: Mechanics/Electrical Equipment/Heavy Industry
Job Title:Electrical engineer
Job description:1)Respect of commissioning and installation of glass production line, coordinary with customer to solver various technology issue and working team arrange.
2)Communication with oversea expert to receive relate technical information and complete installation and debug.
3)Confirm schedule of the project installation following the planning on the contract. Arrange installation people to complete job step by step, resolve every urgently problem on site.
4)Debug every machine and set up the automatic line
5)training the staff of factory to operate and maintenance the gauge.
6)Solved the problem of electrical control circuit.
7)Communication with sales staff for production basical case, I can dispose related software and hardware.
8) inspect control system, and solve problem
9) supply technology direction
10)complete electrical debug
11)coordinate between corporation and client
12)maintains and replace the brake of motor.
13) Configure profibus network, communication between CUP and I/O module, and other ystem, including Ethernet and profibus-DP control network, MPI connecting.
14)Maintenance inverters(CT),maintenance motor with encoder, motor capacity from 4kw to 40 kw.
15)Electrical circuit maintenance and sensor inspection. Including optical switch, magnet switch, touch proximity switch, infrared sensor, encoder, safety lock, sound and light horn, pressure gauge, measurement gauge, thermal couple
16)Robot package maintenance, 6 axis servo motors, backoff programmer, resolve any fault an problem, make sure production no stop. Daily equipment maintenance.
17)my boss project manager is Italy person
Reasons for leaving:
Company”s name:****CO., Limited    Begin and end date: 2005-07-2009-04
Enterprise nature:Soly foreign funded enterprisesIndustry: Communication/Telecom/Network Equipment
Job Title:electrical engineer
Job description:july 2005 to April 2009—-furnace electrical engineer
1)Establish standard job sheet of instrument facility,establish item of maintenance,mission arrangement
2)Following specialist debug instrument equipment,then gave a training to other colleague.
3)In charge of purchase application,acceptance and managemen of equipment.
4)In charge of defect examining,improving step,improving tracking.
5)Resolving accident trouble of  produce and recording the report.
6)Administrate document following the standard of  ISO9000.
7)In charge of course of  5S activity.
8)Contact specialist,argue technology difficulty..
9)In charge of maintence of software and hardware about Siemence PLC,improve control program.
10)Manage daily work in furnace,standard job sheet,polishing environment, purchase, project,solve emergency, maintence.
11)Being familiar with several sensor,proportion valve,electromagnetic valve.
Reasons for leaving:make progress
Educational Background
Name of School:wuhan univercity of technology and science
Highest Degree:BachelorDate of Graduation:2005-07-01
Name of Major 1:automationName of Major 2:
Education experience:
Start dateEnd dateEducation organizationMajorsCertificateCertificate No
2005-102005-10guangzhou training centre of simencePLC
Language Ability
Foreign Language:EnglishLevel:perfect
Chinese level:perfectCantonese Level:normal
Relevant skills and abilities
Personer ability
1.know well siemens S7300/400 programe,applying LAD\CFC\STL wonderfully.
2.be family with S7300/400 hardware configuration and profibus.
3.apply configuration software(e.g wondware of intouch).
4.know electrical control circuit,solve problem quickly.
5.know several transducer(e.g optical sensor/proximity swith/presure swith/presure transmitter/thomercouple)
6.understand electrical drawing.
7.maintaince equipment.
Self-recommendation letter
Open,actively.
i have work in electrical for 8 years,i am available to responsible for industry company engineer position.project experience
1,2005, ** Company ,annually two million tons of steel production furnace installation,at first I am responsible for supervision basement lighting project, electrical panel mounted supervision, pull wiring supervision. Later I am responsible for profibus bus connection with foreign technicians, industrial ethernet connection, I / O check, cold tes. installation time spend three months, then one month for hot commissioning, after project complete, I  am responsible for routine maintenance work. Main configuration device: 10kv transformer and high voltage control cabinet, ABB vacuum circuit breakers, low voltage control cabinet, S7-400 control PLC. (note:Due to confidentiality considerations, hidden some information)

2,2011, ** Company, five cold end solar glass production line, I am responsible for control cabinet installation, wiring supervision, personally responsible for the PLC basic program downloading, hardware configuration, profibus bus connection via Industrial Ethernet , I / O point test, and then follow the hot commissioning with foreign technicians, project time is four months. Additional four months stay in factory to help maintainance. Main configuration: S7-300PLC, ** inverter, encoder **, ** servo motors, software class intouch, winccflex, beckoff PLC. two same project for different cusotmer. (Due to confidentiality considerations, hidden some information)

3, 2012, Kuala Lumpur, Malaysia ,** company, hot end of a glass container handling system, I am responsible for the hot end conveyor equipment installation and commissioning, mechanical part and electrical workare done by myself only, project schedule is within two weeks, the main configurations: * * Drive ** servo motors, conveying equipment. 4 Similar projects. (Due to confidentiality considerations, hidden some information)

© 版权声明

相关文章

暂无评论

暂无评论...